So the order is this (God and weather permitting): cabinets next week, after cabinets are installed we have measurements for the countertop and one week after that the counter will be installed. Then we have the finish work to do (which we will do ourselves). Such as painting and installing new trim (along the floor, and around openings and windows) and a little outdoor trim work where we enlarged the opening for the sliding glass door. We still have two cutouts for the leaded glass windows in the opening to the library (you can see one of them in the picture above). We did that for added character, or bling. Ha!
We are so thankful for how smoothly everything has been going (especially since the floor removal part). It's been a little surreal to see the process of change! The space looks so different to me now, I find myself just sitting down and staring at the room sometimes!